Chevron Phillips St. James Plant

300,000 #/hour Boiler

This project involved the installation and start-up of fuel dilution system on a 300,000 pound/hour boiler at Chevron's St.James Louisiana plant.

JLCC provided all of the fuel dilution mixer design work as well as providing on-site installation quality control checks, and start up trouble-shooting.

Overall NOx emissions have been reduced by  ~ 87%.

Have questions, or would like references?

Please email jerry@knocksout.com

Return to Home Page