Chevron Phillips St. James Plant
300,000 #/hour Boiler
|
This project
involved the installation and start-up of fuel dilution system on a 300,000
pound/hour boiler at Chevron's St.James JLCC provided all of the fuel dilution mixer design work as well as providing on-site installation quality control checks, and start up trouble-shooting. Overall NOx emissions have been reduced by ~ 87%. Have questions, or would like references? Please email jerry@knocksout.com |